Current location: > Case > cluster well
Project Case Study: Yongye-1HF Well
Project Summary: Yongye-1HF Date:​ August 2015 Well Name:​ Yongye-1HF Operator/Service Company:​ Sinopec Chongqing Drilling Intervals:​ 3605–3782 m 5116–5536 m Technical Challenges:​ Complex Formations:​ Geologically complex block. Drilling Fluid:​ High‑density Oil‑Based Mud (OBM). High Temperature:​ Elevated downhole temperature
Project Case Study: MaD4221 Well
Project Summary: MaD4221 Well Date:​ June 2015 Well Name:​ MaD4221 Operator/Service Company:​ PetroChina Xinjiang Oilfield Company Total Depth:​ 3950 m Key Features:​ First Development Directional Well​ in the Mahu Block. Structural Position:​ Western Slope of Mahu Sag, Central Depression, Junggar Basin.
sichuan longgang gas field-4
Time:2018/5
Well name:longgang-18well
Service company:PetroChina Sichuan Drilling Institute
Well depth:5777M
Feature:Sichuan Longgang Gas Field High Temperature Gas Well, Bottom Static Temperature 150°C
sichuan longgang gas field-3
Time:2008/5
Well name:longgang-18#
Service company:PetroChina Sichuan Drilling Institute
Well depth:5777M
Sichuan Longgang Gas Field High Temperature Gas Well, Bottom Static Temperature 150°C
sichuan longgang gas field
Time:2008/5
Well name:longgang-18#
Service company:PetroChina Sichuan Drilling Institute
Well depth:5777M
Feature:Sichuan Longgang Gas Field High Temperature Gas Well, Bottom Static Temperature 150°C
TOP